SpringHill Suites conversion: 150 hotel bathrooms renovated in Greenville
150 guest bathrooms, 8 ADA bathrooms and the lobby restrooms renovated while the hotel stayed open.
The problem
A Holiday Inn on Woodruff Road was being converted into a SpringHill Inn & Suites, and the hotel had to stay open the whole time. Once walls were opened, problems in the original plumbing started to show up.
What we found
Behind the walls, parts of the original plumbing system had not been installed correctly. Each problem had to be fixed as the renovation moved room by room, without slowing the schedule or disturbing guests.
What we did
- Full plumbing renovation of 150 guest bathrooms, including 8 ADA-accessible bathrooms, with new copper supply rough-in and shower valves.
- Renovated and upgraded the lobby restrooms.
- Added water coolers to the facility.
- Found and corrected problems in the original plumbing system as the renovation progressed.
The result
A complete plumbing renovation delivered with the hotel operating from start to finish, and the original system's problems corrected along the way.
More photos
Questions about this job
Can a hotel stay open during a plumbing renovation?
Yes, with planning. On this job the hotel stayed open from start to finish. The work moved room by room, so only the rooms being renovated were out of service at any time.
What happens when problems turn up behind the walls?
They get fixed as part of the job. Here, parts of the original plumbing had not been installed correctly, and each problem was corrected as the renovation reached it, without holding up the schedule.
Do you work with general contractors?
Yes. This renovation was done for SKA Construction as the general contractor. Ethical Plumbing holds a South Carolina General Contractor license (CLG.127052) along with its plumbing license. See hotel renovation plumbing.
Learn more
Similar jobs
4 DoubleTree Hotel hot water system rescue in Greenville
A new hotel's water heating system corrected in time for its scheduled opening and ribbon cutting.
See the full job
5 Project Arbor: warehouse to manufacturing plant in Spartanburg
An empty warehouse shell plumbed into a working paper bag manufacturing plant.
See the full jobReady when you are
Tell us what's going on.
A Master Plumber will find the cause, explain it in plain terms, and put your options in writing before any work starts.
- A licensed Master Plumber on every job
- Serving the Upstate for 16+ years
- Written prices, every job