Skip to main content

Our phone line answers around the clock

A licensed Master Plumber on every job

SC license CLM.117181 NC license L.38212 864-438-0525

Bathroom plumbing

Bathroom remodel plumbing in Greenville and the Upstate

Bathroom remodel plumbing done right behind the walls: drains, supply lines and valves set where your new layout needs them, inspected before the tile goes up.

A licensed Master Plumber on every job

Renovated hotel shower with grab bar and new valve

Do I need a plumber for a bathroom remodel?

Yes, whenever a remodel moves or replaces a toilet, shower, tub or sink, or opens walls with pipe inside. Ethical Plumbing handles the plumbing for bathroom remodels, from rough-in to fixture installation, and works alongside your contractor. We do the plumbing, not the full remodel. Call 864-438-0525.

  • Rough-in and relocation
  • Shower valves and drains
  • Fixture installation
  • Works with your contractor

The plumbing is the part you cannot redo later

Once tile and drywall go up, the pipe behind them is there for decades. That is why the plumbing stage of a bathroom remodel matters more than any finish you pick. Drains need the right slope and venting, shower valves need to sit at the right depth for the trim you chose, and supply lines need shutoffs where you can reach them.

We plan the plumbing with you and your contractor before demolition, replace aging pipe while the walls are open, and pressure-test everything before it is covered. If your home still has galvanized or polybutylene supply lines, a remodel is the cheapest time to replace them; ask about repiping the rest of the house while you are at it.

What we handle in a bathroom remodel

  • Moving fixtures

    Relocating toilets, sinks, showers and tubs, with new drains and supply lines.

  • Showers and valves

    Pressure-balanced or thermostatic valves, body sprays and curbless shower drains.

  • Toilets and vanities

    New flanges, shutoffs and supply lines, with fixtures set level and sealed.

  • Tubs

    Freestanding and alcove tubs, with the drain and filler where the design needs them.

Plan the plumbing before demolition

A few decisions save time and money:

  • Pick the shower valve and trim first
  • Confirm where the toilet flange can move
  • Decide on a curbless shower before framing
  • Replace old supply pipe while walls are open
  • Add shutoff valves at every fixture
  • Leave an access panel behind the shower if you can
Hotel guest bathroom vanity after a plumbing renovation

How a visit works

  1. You book a time

    Online or by phone. We confirm your arrival window and call when the plumber is on the way, or text or email if we cannot reach you.

  2. We find the cause

    A licensed Master Plumber diagnoses the problem and explains it in plain terms.

  3. You choose, in writing

    You get your options side by side with written prices. Nothing starts until you approve.

  4. We fix it and walk you through it

    Clean work area, tested result, and a walkthrough before we leave.

Why homeowners call Ethical Plumbing for bathroom remodel plumbing

Every job starts with a diagnosis from a licensed plumber, not a sales pitch. We explain what we found in plain terms, show you the options side by side, and put the prices in writing before anything starts. If a repair makes more sense than a replacement, we say so.

We treat your home like a job site that people live in: shoe covers on, work area protected, cleaned up before we leave, and a walkthrough of what we did. Ethical Plumbing has served the Upstate since 2010, and our team brings 100+ years of combined plumbing experience. You can meet our plumbers or read what customers say.

What customers say

Every review here is from a real customer. Names are shortened for privacy.

4.7 580 Google reviews
Google

Scott and Dorian were very knowledgeable, professional and thorough. We were given a detailed explanation of the work needed.

Russel B.
Google

Nick was very thorough explaining our options, and didn't track in dirt on our floors.

William H.
Google

Tristan was very knowledgeable and professional from our initial conversation to the follow up when the work was complete.

Mary D.Water heater installation

Bathroom remodel plumbing FAQs

Do you do full bathroom remodels?

No. We handle the plumbing for bathroom remodels and work alongside your contractor, who handles tile, cabinets and finishes.

Can you move a toilet to a new spot?

Usually, yes. It depends on the floor structure and drain route. We look at it before you commit to a layout.

Can you install a shower valve I bought?

Yes, as long as it suits your water pressure and the wall depth. We check the model before rough-in.

Should I replace old pipe during a remodel?

If your home has galvanized or polybutylene pipe, yes. With the walls open, replacing it costs much less than later.

Do you pull permits for remodel plumbing?

When the work requires a permit, we let you know and handle the plumbing portion.

How long does bathroom remodel plumbing take?

Rough-in usually takes one to three days depending on what moves. Fixture installation happens after tile and finishes.

Can you install a curbless shower drain?

Yes. Curbless showers need planning at the framing stage so the floor can slope to a linear or center drain.

Do you work with my contractor?

Yes. We coordinate schedules so plumbing is ready before walls close and fixtures go in after finishes.

Ready when you are

Tell us what's going on.

A Master Plumber will find the cause, explain it in plain terms, and put your options in writing before any work starts.

  • A licensed Master Plumber on every job
  • Serving the Upstate since 2010
  • Written prices, every job
Call now Book a visit